
Areas of Expertise
- Crane selection as per
- Preparation of rigging
- Rigging skill for lifting of heavy
- Knowledge of crane safety and crane
- Crane load chart
- Knowledge of safe heavy
- Safe execution of heavy and critical lift like replacing heavy Column and
- Working knowledge of crane and hydra
- Knowledge of crane placing critical
- Expertise crane planning for complex
- Co -ordination of crane fleet during
- Knowledge of EOT , HOT, Electric HOIST and MONORAIL maintenance and
- Inspection of Crane , hydra and other P&M
- Knowledge of tools and tackles inspection and load testing .
- Crane and hydra maintenance and
- Emergency planning of crane and hydra
- Spares
- MIS
- Time
- Preparation of PR and other all activities in
- JMS related
- Excellent
- To support plant HVAC daily pm
- Knowledge of store record keeping like all lubricant and
- Knowledge of safety for P&M
- Practical Knowledge of engine overhauling .
- Practical Knowledge of maintenance in hydraulic and pneumatic .
- Knowledge of preventive maintenance for P&M
Major Highlights job
Shutdown jobs in NMD
- No any single incident in my entire service
Shutdown at EOEG 2008 ,
Crane selection for Shutdown, rigging plan preparation, and executed for replacement of column C-16 and C-17 and other all jobs are safely and timely complete without any incident .
- 2009 in GC plant emergency Column -105 (100 meter height )knout pot suoprt to be provided and rscu plan aslo to be prepared .
- TA IN 2010
Crane selection for Shutdown, rigging plan preparation,and executed for replacement of column C-134 and other all jobs are safely and tamely complete without any incident
- Shutdown at EOEG 2012
Crane selection for Shutdown, rigging plan preparation, and executed for replacement of column C-12 and C-13 and other all jobs are safely and timely complete without any incident
- Shutdown at EOEG 2014
In monsoon all Shutdown jobs were done safely
- TA IN 2015
Crane selection for Shutdown, rigging plan preparation, and executed for replacement of E-4111 60 MT exchanger in LLDPE plant resulted in saving 1 crore and saving 25 days of timing saving in TA 2015 OVER 2009 , using 650 mt hydraulic crane
,replacement of (115 meter heighted) flier tip and also replacement of V-15 in LDPE and other all jobs are safely and timely completed without any single incident.
CERITFICATION:
- Certificated in hydraulic maintenance by M/s Push mobile academy .
- Certificated in maintenance of Diesel Engine by M/s Cummins India Ltd .
- Certificated in hydraulic maintenance by M/s escort India Ltd .
TOTAL EXPPRIENCE IN P&M OVERALL 38 YEARS and 04 MONTHS IN RIL NMD COMPLEX.
Bajaj Auto Ltd Sambhaji Nagar maintenance experience 4 years .
Realince NMD Complex P&M Overall experience 34 years and 04 months Retired As a Senior Associate Manager (Mechacanical) (Joining date: 15-Mar-1989, Retired:31-Jan-2023) (Rejoining at RIL NMD as Fix term engineer from Dec 2023 to June 2024)